Hello everyone!
Since we started making our videos in January, the blog/newsletter has been a bit neglected. Making videos is fun, and takes quite a bit of time, and we didn’t really want to be doing all our videos in blog format too as it would be a bit of a double take. But, now that Spring has finally arrived here in Portugal, it is time for a little Spring update for those who do not (want to) watch our videos on Youtube (yet?!). If you’re still on the fence about following us there, I will be including some links to videos for parts of this update should you want to see some very specific things in video format! Starting with this tour of our land in springtime, one of my favourite videos to date!
The heating is still on!

One of the last things we wrote about was our heating, which was a bit of an issue immediately after moving in, but, we can assure you, it is still working now. In fact, we’ve had to use it up until this weekend because the Portuguese Spring has not been great. Where the North of Europe has seen worrying draught and record temperatures and hours of sunshine, our February – May have been very cold and wet. The wood burner has also done some heavy lifting there in the evenings!
The good thing is that there is no longer any draught anywhere in the country and the reservoirs are full, but of course it has meant more money spent on diesel to heat the home, and not as much outside work as we wanted to do. Horizontal rain and 12 degrees Celsius aren’t the best conditions for restoring an old barn, for example.
Having said that, Spring does seem to finally be really here now, so we’re looking forward to getting some more stable weather, more inside and outside work and, of course, a higher Vitamin D4 intake.
Progress on the House
Between January and May not a lot has happened inside the house. What we did do was a lot of planning and scouting, and some ordering as well. At the end of January we had decided on a window setter, and they came to measure the windows early in February with a view to install them late March/early April.
While the windows themselves were actually ready and manufactured at the end of March, the bad weather meant that the window setters themselves could not get all their work done at their normal speed. There was a backlog of work they needed to get through (and that also got put back because of more (horizontal) rain), but eventually, they committed to installing the windows in the week of the 5th of May.
With that date in mind, we also had a very good reason to start on taking out the old kitchen and set up our temporary kitchen. On the 1st of May, we moved all our stuff from the main kitchen into the entry hall/utility room and started removing the first tiles! The tiles were clearly put in to survive a nuclear blast, so it is slow going, but we’re slowly making our way through all the work that needs doing when we have the time: don’t forget, we have two full-time jobs next to this! At the time of writing, we have also, with the help from René’s dad, removed almost all the kitchen units, leaving just the sink unit until we have fixed a water connection there. Wastewater we’ll collect in a 30-tank for the time being instead of also installing temporary plumbing; hopefully it’s also another incentive to hurry the f*ck up.



After we did the pre-work in the kitchen removing the tiles around the windows, the windows were also all replaced. And with that also all our windowsills, roll shutters and the installation of new mosquito nets to keep nature out a bit! These last have already been used to much satisfaction now that the days and nights are getting warm enough to have the windows open!
Between all of this we have also already chosen, ordered and got delivered (the majority of) our new kitchen! We designed the kitchen ourselves in the IKEA planner and will be installing everything but the Quartz worktop ourselves. In order for us to be able to progress as and when we’re ready, we already had the delivery done so that we can get to that in our own time instead of waiting until everything is ready for the units. Given that we’re now already waiting 3 weeks for some missing corner cabinets and other parts that weren’t available, we know it was the right choice, even though we still might not get to this until July/August.
In the meantime we also completed our (preliminary) electrical plan which is now with the electrician for checking. We’ll be doing a lot of the menial work ourselves, but anything signing off and around the consumer unit we will want to make sure is done by a certified electrician, if only for insurance purposes.
Progress Outside
So, what did we manage to do outside between January and now? Quite a bit still! In part thankst to our wonderful neighbour. She has got a big tractor with all the fittings, including the one that mows the grass! In January, she helped us with mowing the olive grove, and just last week she also took on our two terraces which had seen enormous growth in the last few weeks combining still a lot of rain with some cautious sunshine from time to time. She doesn’t only have the big tractor, but also two wonderful horses who are currently again grazing the grove for a more natural cut.

All but 4 of the olive trees have been completely pruned. The haircuts they received were quite severe, so we’re not expecting a big olive harvest this year. This is fine as we will not yet have a lot of space to process them with all of the internal work that is going on. With the harvest we do get, we will do at least some experimenting with brining.

As part of our long-term plan to slowly replace our pine forest with more leaf trees, and of course with fire protection in mind, we felled a lot of the younger pine trees that were right behind our house (and have more to go) and stripped them to be used as boundaries for our first experimental raised beds very soon.

We built a nice home for Shadow who is now officially, we guess, our outside cat. We named him Shadow because he follows us EVERYWHERE on the land. A big storm in February blew away the cardboard box in which he was living outside our door, so it was time really to make a decision, and the decision was that we didn’t want him to be miserable.

Things we did not (yet) do outside
We didn’t prune all the trees. Mostly because we already had enough wood to process (shred/burn/saw into firewood), but also because we wanted to see what (parts of) trees were still viable! With winter lasting so long, it was very difficult for us novices to gauge whether the trees were still alive. So instead of risking cutting down the good bits, we followed permaculture principles. This means to wait and see what happens for the first year. We were glad we did that! We discovered some trees to be still alive of which we were convinced they were totally gone and had some disappointments where we had truly hoped they would still be salvageable!
We didn’t start any raised beds nor plant any new trees yet either. In part because the weather was so, so bad. It wasn’t freezing, of course, but with many storms passing over we also didn’t want to risk any damage to new veggies and trees. We really have to not forget that we’re working two full-time jobs here as well, and while we want to become as self-sufficient eventually as possible, in these early stages we have to really pick our priorities and battles, and the living floor is our current priority.
The other part, particularly for the trees, is deciding what maturity-level tree we’d want to invest in. It’s easy and cheap enough to buy a few sapling trees and then wait for quite a few years until they produce. But perhaps there are some fruit varieties that we would want something a bit sooner. However, that comes at a steep price increase. From roughly 14 euros for a sapling to easily 200 euros for a more mature tree.
We have not yet done any work on the outbuildings. We are planning to use the largest outbuilding as a practice ground for plastering at some point, which as a somewhat quick win might also make things look a bit nicer than the old worn grey at the moment. The side part of the outbuilding that will become our outdoor living area might at some point also get some basic tackling of getting to a blank canvas, but we have yet to decide whether we use the footprint only and start from scratch, or save the existing structure.. and go from there.
What is next?
‘The rest of it…’
We’re not under any illusion that the bulk of the work on our living floor will be done this year. Indeed, it will go well into 2026, perhaps even 2027. Our main priority is the kitchen, which is also the most difficult room to tackle. From thereon we’ll make our way through the floor room by room. As for the outside work, it will be a bit haphazard and maintenance-focused, with some trial (and error) in the mix. Our immediate next actions, therefore, are mostly in exact order or in tandem:
- Install water (hot and cold) in the temporary kitchen
- Rip out the rest of the old kitchen (radiator, sink, wall tiles, floor tiles and render)
- Order floor tiles
- Get in touch with the heat pump company we have identified
- Order parts for our underfloor heating after agreeing on heat pump set-up
- Get parts for electrical work
- Prepare kitchen for electrical installation
Without these things we cannot progress the kitchen, so it’s not worth it listing all the other things that are on our project to do list! But… we’ll get there. We have a cautious deadline of the end of May for having finished all the ripping out of the kitchen (will be doing some evenings after work as well…) and then the first half of June for electrical prep, but we’ll take it step by step. Our temp kitchen is lovely, we have a comfortable bed and a nice sofa, so… we’re living more comfortable than many other people out there.